Replacing a concrete driveway in Central Indiana costs $6,000 to $14,000 for a standard two-car driveway. The finish you choose moves dictates where you fall in that price range. A basic broom finish costs $10 to $13 per square foot for the pour, while stamped or exposed aggregate pushes $18 to $25. But the pour is only part of the bill. Replacement also means tearing out the old slab ($2 to $4 per square foot), and often subgrade repair, drainage grading, and permits.
That’s the gap that catches homeowners off guard: most online estimates quote new-pour pricing alone, which makes replacement look cheaper than it is. Replacing a driveway isn’t the same as pouring a new one. Mattingly Concrete handles the full process for residential concrete driveway projects, from tearout to final pour. Keep reading to see every line item that separates a lowball bid from a realistic budget.
What Tearout and Removal Actually Cost

Before new concrete goes down, the old slab has to come out. Demolition runs $2 to $4 per square foot for a standard 4-inch residential driveway. For a 600-square-foot driveway, that puts tearout between $1,200 and $2,400. The price varies with thickness, reinforcement type, and how accessible the driveway is to equipment. Accessibility issues often come up on larger lots around Westfield and Zionsville, where longer driveways and tighter access points can add to demolition time.
Hauling is usually included in the demolition bid. If the driveway was poured over an older slab or patched multiple times, expect tearout costs toward the higher end of the range.
New Pour Pricing by Finish Level
Standard and Mid-Range Options
A basic broom-finish driveway in Central Indiana runs $10 to $13 per square foot for the pour itself. Adding integral color or rebar reinforcement brings the price to the $14 to $17 per square foot mid-range. For a 600-square-foot two-car driveway, the pour alone costs $6,000 to $10,200 before tearout and site prep. A detailed breakdown of concrete driveway costs helps homeowners compare bids on equal terms.
Decorative and High-End Finishes
Stamped patterns, exposed aggregate, and custom borders push the price to $18 to $25 or more per square foot. A 600-square-foot stamped driveway can run $10,800 to $15,000 for concrete work alone. These finishes also need resealing every two to three years to maintain appearance and color integrity.
Hidden Costs Most Quotes Leave Out
The gap between a low bid and a realistic budget usually hides in line items that some contractors omit from the initial quote:
- Subgrade repair: Eroded or settled soil beneath the old slab needs excavation and compacted aggregate replacement, adding $500 to $1,500 to the project.
- Permits: Most Indianapolis-area municipalities require a permit for driveway replacement. Mattingly Concrete handles permitting as part of the project.
- Apron and approach: The section between the street and driveway may be city-owned and require separate approval or replacement.
- Drainage grading: Proper water flow away from the garage and foundation is essential but not always included in the lowest bids.
When evaluating quotes, ask whether tearout, hauling, subgrade prep, and permits are included. Understanding the difference between repair and replacement costs helps you decide which approach fits your driveway’s condition.
When Replacement Pays Off Over Repair
If more than 25% to 30% of the surface is cracked, settled, or spalling, repairs become a short-term fix on a long-term problem. Resurfacing over a compromised base fails within a few years because the overlay cannot compensate for movement underneath.
A full replacement with proper base work and steel reinforcement should last at least 30 years in Central Indiana with routine sealing. Measured against repeated repair cycles, replacement often costs less per year of service. The break-even point typically arrives around year five when the first round of patches would need redoing.
Frequently Asked Questions
How long does a driveway replacement take?
Most residential replacements take three to five days from demolition through the final pour. The driveway should not carry vehicle traffic for at least seven full days after pouring.
Can I replace just part of my driveway?
Partial replacement works when damage is limited to one section. The new concrete will not match the existing surface in color or texture, and the joint between old and new is a common failure point. Full replacement provides a uniform surface.
Does driveway replacement require a permit?
Yes, most jurisdictions in the Indianapolis metro require a permit for driveway replacement. Mattingly Concrete handles all permitting and inspection coordination as part of every project.
Budget for the Whole Job, Not Just the Pour
The lowest driveway quote is rarely the cheapest one to actually finish. The price that holds up is the one that already includes the tearout, the base work, the drainage, and the permit. For a standard 600-square-foot driveway in Central Indiana, a complete budget lands somewhere between $6,000 and $14,000, depending on the shape of your old base and the finish you want on the new one.
When you’re comparing bids, ask each contractor what’s actually in the number. Mattingly Concrete has been replacing driveways across Indianapolis, Carmel, and Fishers since 1987. Every quote from our team covers the full job, with tearout, permits, and a one-year warranty included. Call (317) 867-4049 or request a free estimate online for a number you can count on.